Skip to content
This product has been discontinued.

12 in. long, Lead screw ONLY

Original price $65.00 - Original price $65.00
Original price $65.00
$65.00
$65.00 - $65.00
Current price $65.00

The information provided on this page is retained for posterity.

This product is no longer for sale at AndyMark and has been discontinued

This product is currently unavailable for purchase

SKU am-3257
  • Description
  • Specifications
  • Documentation
  • This ACME, precision lead screw with two (2) starts has right hand threads of five (5) turns per inch. The lead screw is made from high strength 4140 steel and has been machined to fit into the DART linear actuator. The bronze nut rides smoothly over the lead screw threads, and has it's own threads on the outside diameter in order to be mounted into a tube, shaft, or housing. This pair is useful in many robotic applications to turn rotational motion from a motor into linear motion as the nut travels the length of the lead screw. This is the lead screw and nut used in the DART linear actuator.

    These PowerAc™ Inch Acme screws and nuts include a centralizing thread form to prevent wedging and binding. When compared to general-purpose thread forms, centralizing threads are manufactured with tighter tolerances and reduced clearance on the major diameter to increase precision and reduce issues.


    Nut Specifications:

    • Outside Diameter: 0.5 in.
    • Pitch: 0.1 in.
    • Weight: 0.7 lbs.
  • CAD Files

    am-3257 DART 12 Lead Screw.STEP

    Layout Prints

    am-3257 DART 12 Lead Screw.pdf

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Purchase options
Select a purchase option to pre order this product
Countdown header
Countdown message


DAYS
:
HRS
:
MINS
:
SECS